Month: February 2008

Happy Leap Day! Hint 5 now done.Happy Leap Day! Hint 5 now done.

I finished hint 5 of the SoSii stole this morning. What a beautiful pattern this is turning out to be! Just love the design and the way the stole drapes.

I have slowed down on my knitting due to too many things to do and not enough time to knit. So while hint 7 was posted this morning, I will be starting hint 6 sometime later tonight (I hope…)

As our son’s wedding draws closer, I find that I have more things to do related to the wedding and less time to just sit and knit. But, I need to stay with this project as it is intended to be a gift for the bride to wear on her wedding day.

Hint 4 Completed This MorningHint 4 Completed This Morning

I finished knitting hint 4 of the Secret of the Stole II this morning. You can see the close-up of the hint in this picture.

Pattern is absolutely lovely and is knitting up beautifully in the 100 % Monogolian Cashmere yarn. I can’t tell for certain at this point whether the right edge will continue growing at an angle or will begin to form a curved edge on the next hint.

This picture shows the entire length of the stole as knitted to this point. Very lovely and soft — and perfect for a bride!

Secret of the Stole II: Hint 3Secret of the Stole II: Hint 3

Finished Hint 3 in the cashmere yarn on 2/7/08. It’s turning out to be an intriguing pattern. Diamonds, rosettes and slanting lines.

Pinned flat the piece is at least 24 inches wide. So it will be wider still when wet blocked. It’s also about 30 inches long, so it appears that the finished length will be longer than the estimated 60 inches DK gave at the start of this KAL.

I have decided to put the superfine merino yarn on hold for now. I’m finding that I don’t have as much time to knit as I thought I would.

Started hint 4 yesterday — and there was an interesting change in the pattern — we started adding additional stitches along the right side. Is this going to be a triangle? Hmmm….